All services West of Main Street and South of Parrish Lane (400 North) to Pages Lane (1000 South)
All services connected to Porter Lane (400 South), Main Street to 225 East
All services connected to Main Street between Parrish Lane (400 North) and Pages Lane (1000 South). This includes the Whitaker Museum and Canyon Breeze Drive (475 South and 225 East)
All services in Bountiful serviced by CDCIC located on 200 West and Pages Lane (1600 North Bountiful)
This leak repair will require UDOT permitting and an available contractor.
This location is extremely complicated with two stream channel pipes, transcontinental fiber ducts, a high pressure gas transmission line, several culinary water lines. sewer lines and telecommunication fiber and copper lines.
In the short term we will be working on an alternate supply connection for the majority of the outage. Services on Main Street from Parrish Lane (400 North) to Porter Lane (400 South) should expect a longer outage.
A leak in Pages Lane (1000 South) requires the shutdown of the following area.
All services connected to Pages Lane (1000 South) from 400 East to 700 East
Repair updates will be posted here as they become available.