Outage
Parrish Lane (400 N), 100 E to 400 E One or two leaks. The scheduled contractor is unavailable until Tuesday 2022-05-31. We will attempt to restore service on Tuesday 2022-05-31. Service has been restored to the following areas: Main Street and West to the Frontage Road, between Parrish Lane (400 N) and Pages Lane (1000 S) Porter Lane East of Main St to 200 E Canyon Breeze Drive (475 S) and 225 E to Porter Lane (400 S) Courtyard at Pages Lane, Pages Lane (1000 S) and Main St Cottage on the Corner, 300 E and Pages Lane (1000 S) 200 E, 300 S to 400 S Hughes St, Chase Ln to Powell Av 100 N, 100 E to 400 E A main line leak at Porter Lane (400 South) and Main Street requires the shutdown of the following areas.
All services connected to Main Street and West to the Frontage Road, between Parrish Lane (400 North) and Pages Lane (1000 South). Services on Porter Lane East of Main Street to 200 East. Canyon Breeze Drive (475 South) and 225 East to Porter Lane (400 South). Courtyard at Pages Lane, Pages Lane (1000 South) and Main Street. Cottage on the Corner, 300 East and Pages Lane (1000 South). We will attempt a partial repair to restore service to these areas. Main Street between Parrish Lane (400 North) and Porter Lane (400 South) will require contractor scheduling and UDOT permitting for repair. Updates will be posted here as they become available. A main line leak in the street at 891 South 600 East requires the shutdown of the following area.
600 East , 853 South to 900 South and Estella Circle Some properties on street intersection corners will still have water because their service is connected to a street outside of the shutdown. Our preferred contractor has been contacted and Blue Stakes must come out to be legal before repairs can begin. Repairs may be complete by 6pm September 3rd, if the contractor's schedule allows. Outage Main street, Parrish Lane (400 North) to Porter Lane (400 South). We hope to have permitting approved & a contractor working early next week.
A service leak requires the shutdown of Mountain View Road
from Applewood Drive (650 N) to the intersection with Creek View Road @ 600 West. This includes Mountain View Circle. The service will have to be excavated and repaired before the main line can be turned on. Repairs may be complete by 6pm May 11, if other emergencies do not interrupt repairs. All previous outages repaired and in service.
A leak in the street on London Road requires the shutdown of the following area. 340 East (Pheasant Way), 583 South to 700 North. London Road, Bonita Way to 400 East. Linda Loma Drive, London Road to 700 North. A contractor will have to be scheduled and Blue Stakes to be legal before repairs can begin. Repairs may be complete by 6pm May 1, if a contractor is available. 1. A leak in the street on 340 East (Pheasant Way) requires the shutdown
of the following area. 340 East (Pheasant Way), 583 South to 700 North. London Road, Bonita Way to 400 East. 700 South, Bonita Way to 340 East (Pheasant Way). Cherrywood Circle. Linda Loma Drive, London Road to 700 North. A contractor will have to be scheduled and Blue Stakes legal before repairs can begin. Repairs may be complete by 6pm April 24 if a contractor is available. 2. 400 South (Porter Lane), 3 services need to be repaired outside of the road. Repairs should be complete by 6pm April 22, dependent on the number of emergencies in the delivery system. |