Leak in Main street at 625 North SR 106. 400 North (Parrish Lane to 1000 North (Chase Lane) West side of Main Street. 650 North to 1000 North (Chase Lane) East side of Main Street. We will have to get a permit from the UDOT and then our contractor can work in the state Right of Way after the Blue Stakes are legal. Work is not expected to begin until Wednesday at the earliest.arlies
Main Line leak at 950 South and 700 East.
Outages 700 East and 400 South (Porter Lane) to 1000 South (Pages Lane), 600 South, 650 South, 700 South , 800 South and 950 South, East of 700 East, 800 East between 600 South and 800 South. Contractor will call in Blue Stakes on Monday 2019-05-13. Leak should be repaired by Wednesday 2019-05-15. Main Line leak at 918 South 700 East. (SAME OUTAGE AS BEFORE) 700 East 400 South (Porter Lane) to 1000 South (Pages Lane), 600 South, 650 South, 700 South and 800 South, East of 700 East, 800 East between 600 South and 800 South.
Contractor will call in Blue Stakes on Monday 2019-05-06. Leak should be repaired by Thursday 2019-05-09. 700 East from 400 South to Pages Lane. 800 East between 600 South and 800 South. 600 South, 650 South, 700 South, 800 South & 950 South East of 700 East.
700 East between Porter Lane and Pages Lane
600 South, 650 South, 700 South and 800 South East of 700 East 800 South between 499 East and 552 East
475 East between 700 South and 600 East for a leak repair. |
For specific comments or questions please contact us.
Archives
April 2024
|