Repair completed and estimated pressurization 2023-05-12 at 6PM.
All services connected to 700 East; Porter Lane (400 South) to Pages Lane (1000 South), 600 South; 700 East to 800 East, 650 South; 700 East to 800 East, 700 South; 600 East to 800 East, 800 South; 700 East to 800 East, 950 South; 700 East to 750 East and 800 East; 600 South to 800 South. Repairs are completed at 700 S 700 E and 450 South 700 E. Estimated pressurization 2023-05-12 at 6PM.
Scheduling and Permitting.
All services connected to Main Street between Parrish Lane (400 North) and Chase Lane (1000 North).
Excluded are services on the East side of Main Street from Parrish Lane (400 North) to 650 North.
The contractor that we use for state roads has not mobilized to do this repair. UDOT permitting has been submitted for two different contractors. Estimated completion 2023-05-17 at 6PM.
All services connected to Main Street between Porter Lane (400 South) and Pages Lane (1000 South).
This outage includes Canyon Breeze Drive (475 South) and 225 East from Porter Lane (400 South) to Canyon Breeze Drive (475 South). The contractor that we use for state roads has not mobilized to do this
repair. UDOT permitting has been submitted for two different contractors. Estimated completion 2023-05-19 at 6PM.
Delays in service due to construction and leak repairs occur every year and is normal in all irrigation systems. Repair updates will be posted here as they become available.
All services connected to 700 East; Porter Lane (400 South) to Pages Lane (1000 South), 600 South; 700 East to 800 East, 650 South; 700 East to 800 East, 700 South; 600 East to 800 East, 800 South; 700 East to 800 East, 950 South; 700 East to 750 East and 800 East; 600 South to 800 South. Repairs are completed at 700 S 700 E and 450 South 700 E. Estimated pressurization 2023-05-12 at 6PM.
Scheduling and Permitting.
All services connected to Main Street between Parrish Lane (400 North) and Chase Lane (1000 North).
Excluded are services on the East side of Main Street from Parrish Lane (400 North) to 650 North.
The contractor that we use for state roads has not mobilized to do this repair. UDOT permitting has been submitted for two different contractors. Estimated completion 2023-05-17 at 6PM.
All services connected to Main Street between Porter Lane (400 South) and Pages Lane (1000 South).
This outage includes Canyon Breeze Drive (475 South) and 225 East from Porter Lane (400 South) to Canyon Breeze Drive (475 South). The contractor that we use for state roads has not mobilized to do this
repair. UDOT permitting has been submitted for two different contractors. Estimated completion 2023-05-19 at 6PM.
Delays in service due to construction and leak repairs occur every year and is normal in all irrigation systems. Repair updates will be posted here as they become available.