The UDOT Encroachment Permit was approved and repairs in the state road right of way were allowed to begin on 2023-05-24.
The North Main Street Outage was repaired and in service by 5PM on 2023-05-24.
Leak repairs for the South Main Street Outage will begin on 2023-05-25
All services connected to Main Street between Porter Lane (400 South) and Pages Lane (1000 South).
This outage includes Canyon Breeze Drive (475 South) and 225 East from Porter Lane (400 South) to Canyon Breeze Drive (475 South).
Estimated completion 2023-05-25 at 6PM.
Delays in service due to construction and leak repairs occur every year and is normal in all irrigation systems.
Repair updates will be posted here as they become available.
The North Main Street Outage was repaired and in service by 5PM on 2023-05-24.
Leak repairs for the South Main Street Outage will begin on 2023-05-25
All services connected to Main Street between Porter Lane (400 South) and Pages Lane (1000 South).
This outage includes Canyon Breeze Drive (475 South) and 225 East from Porter Lane (400 South) to Canyon Breeze Drive (475 South).
Estimated completion 2023-05-25 at 6PM.
Delays in service due to construction and leak repairs occur every year and is normal in all irrigation systems.
Repair updates will be posted here as they become available.